Projects

Dorax Investment's global operations are not limited by volumes, complex project nature or by any state borders.

We have highlighted some of our key projects and are available to share our extensive experience and assist in identifying optimum key solutions.

 

2007/Tunisia

Investment project for constructing a tourist area in Ras-Jeddir close to the border of Tunisia and Libya. The governments of both countries are customers and guarantors respectively. The total volume of attracted funds is approximately US$ 170,000,000.

 

2007/Tunisia

Investment project for the construction of an oil refinery plant in Skhira. Resources attracted by Dorax Investment from the Chinese People's Republic assisted this mutual project for the Tunisian and Libyan governmental authorities.

2006/Zimbabwe

Construction project for a line producing nickel cathodes and modernising copper shop at the Bindura nickel smelter and refinery complex. The investments' volume supplied under assistance of Dorax Investments is more than US$ 70,000,000.

2006/Brazil

With the assistance of Dorax Investmentss the sum over US$ 90,000,000 has been raised for the project of remodeling blast furnace No. 1 at the Acesita steel casting foundry.

2005/Brazil

With aid from Dorax Investments,the sum of over US$ 70,000,000 has been raised for the project of modernising blast furnace No. 2 and cold rolled mill products' shop at the Acesita steel casting foundry.

2005/Iran

Dorax Investments has been a financial operating and intermediate party for the project of constructing copper casting works in Katunabad as a part of the Sarcesme copper smelter complex. Some leading Chinese professional contractors have been drawn respectively.

2004/Iran

Dorax Investments has been a financial operating and intermediate party for the project of constructing the second preparatory unit at the Sarcesme copper smelter complex. Some leading Chinese professional contractors have been drawn respectively.

2002/Tunisia

Project of modernising catalytic converter from 35 up to 40 cub. m/hour for the line producing liquefied gas at the Bizerta oil refinery plant. The works have been performed by the Heurtey Industries as the customer of Dorax Investments.